| Click Icons for Flight Data and Information |
|
Sunday
|
Monday
|
Tuesday
|
Wednesday
|
Thursday
|
Friday
|
Saturday
|
|
1
|
2
|
3
|
4
|
5
| DFRC begins DC8 integration
|
|
6
|
7
|
|
8
|
9
|
10
|
11
|
DC8
Equipment and experimenters arrive at DFRC. Installation of
window mounted items and plumbing begins.
|
|
12
| All experimenter integration teams at DFRC.
Rack inspections begin. |
|
13
|
14
| Installation of racks begins. |
|
|
15
|
16
|
17
|
18
|
19
|
20
| Rack loading complete. Power and ICATS cabling
continues. |
|
21
|
|
22
|
23
|
24
| ER-2 scientists arrive at DFRC |
|
25
| DC-8 upload complete. All installations ready
for flight.Power-up Check. |
|
26
|
DC- 8 Roll out. Defuel, weight and balance, and pressure
check. No experimenter access until late.
Evening Laser Calibrations begin.
Laser calibrations. Period 7/26 - 8/1 time dedicated to laser
cals. Other times, as required.
|
|
27
DC8 Engineering Check Flight. Shake-down, no experimenter access
for flight. |
|
28
|
|
29
|
30
|
31
|
|
|
|
|
| |